{"id":1387,"date":"2025-09-25T11:19:48","date_gmt":"2025-09-25T11:19:48","guid":{"rendered":"https:\/\/exito-e.com\/datacenterxpo\/blog\/?p=1387"},"modified":"2025-09-25T11:20:19","modified_gmt":"2025-09-25T11:20:19","slug":"design-and-construction-of-complex-technological-facilities","status":"publish","type":"post","link":"https:\/\/exito-e.com\/datacenterxpo\/blog\/design-and-construction-of-complex-technological-facilities\/","title":{"rendered":"Design And Construction of Complex Technological Facilities"},"content":{"rendered":"\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/exito-e.com\/datacenterxpo\/blog\/wp-content\/uploads\/2025\/09\/image-1024x576.png\" alt=\"\" class=\"wp-image-1388\" srcset=\"https:\/\/exito-e.com\/datacenterxpo\/blog\/wp-content\/uploads\/2025\/09\/image-1024x576.png 1024w, https:\/\/exito-e.com\/datacenterxpo\/blog\/wp-content\/uploads\/2025\/09\/image-300x169.png 300w, https:\/\/exito-e.com\/datacenterxpo\/blog\/wp-content\/uploads\/2025\/09\/image-768x432.png 768w, https:\/\/exito-e.com\/datacenterxpo\/blog\/wp-content\/uploads\/2025\/09\/image-1536x864.png 1536w, https:\/\/exito-e.com\/datacenterxpo\/blog\/wp-content\/uploads\/2025\/09\/image.png 1543w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h1 class=\"wp-block-heading\"><strong>Data Center Project<\/strong><\/h1>\n\n\n\n<p>Every new data center project presents a unique challenge, requiring a blend of engineering precision and strategic foresight. One such project is Russia&#8217;s first certified Tier IV data center, entirely designed and built by our team on a turnkey basis. In this case, our company acted as the key partner, delivering a comprehensive suite of engineering solutions that ensure reliability, scalability, and energy efficiency.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Project Scope<\/strong><\/h2>\n\n\n\n<p>On a 1.1-hectare site, a facility of more than 20,800 m\u00b2 was constructed.<br>Seven floors, four machine halls, and nearly 3,700 racks form the backbone of the client\u2019s digital infrastructure.<\/p>\n\n\n\n<p>The data center was designed to meet the Tier IV reliability standard, ensuring uninterrupted operation of mission-critical processes and eliminating the risk of downtime.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Power Supply<\/strong><\/h2>\n\n\n\n<p>The project implemented a multi-layered power supply system:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Main supply: sixteen high-capacity transformers ensure stable power for IT and engineering systems.<\/li>\n\n\n\n<li>Backup: sixteen diesel generators provide up to 12 hours of autonomous operation at full load.<\/li>\n\n\n\n<li>UPS systems: four independent circuits supported by Li-ion batteries guarantee seamless switchover with zero downtime.<\/li>\n<\/ul>\n\n\n\n<p>This approach ensures continuous operation even in case of external failures.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Cooling System<\/strong><\/h2>\n\n\n\n<p>Cooling was designed as a distributed hydraulic system with air-cooled chillers and free-cooling technology. Each machine hall is served by twenty chillers.<\/p>\n\n\n\n<p>Cold air is delivered through cold walls, hot air is extracted via ceiling plenums, and humidity is automatically regulated. Buffer tanks provide up to seven minutes of autonomous cooling, allowing for maintenance without interruption.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Key Results&nbsp;<\/strong><\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Tier IV reliability \u2014 protection of mission-critical operations.<\/li>\n\n\n\n<li>Scalability \u2014 thousands of racks and flexible architecture to support growth.<\/li>\n\n\n\n<li>Energy efficiency \u2014 free-cooling technology reduces operating costs.<\/li>\n\n\n\n<li>Autonomy \u2014 resilience against external power outages.<\/li>\n<\/ul>\n\n\n\n<p>This project demonstrates how our company transforms engineering solutions into the foundation of a digital future. We were involved at every key stage \u2013 from design and construction coordination to system integration \u2013 delivering the highest levels of reliability and efficiency.<br><br><a href=\"https:\/\/sv-tech.ru\/en\">To know more: https:\/\/sv-tech.ru\/en<\/a><\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Data Center Project Every new data center project presents a unique challenge, requiring a blend of engineering precision and strategic foresight. One such project is Russia&#8217;s first certified Tier IV data center, entirely designed and built by our team on a turnkey basis. In this case, our company acted as the key partner, delivering a [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1389,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-1387","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-data-center-xpo"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Design And Construction of Complex Technological Facilities<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/exito-e.com\/datacenterxpo\/blog\/design-and-construction-of-complex-technological-facilities\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Design And Construction of Complex Technological Facilities\" \/>\n<meta property=\"og:description\" content=\"Data Center Project Every new data center project presents a unique challenge, requiring a blend of engineering precision and strategic foresight. One such project is Russia&#8217;s first certified Tier IV data center, entirely designed and built by our team on a turnkey basis. In this case, our company acted as the key partner, delivering a [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/exito-e.com\/datacenterxpo\/blog\/design-and-construction-of-complex-technological-facilities\/\" \/>\n<meta property=\"og:site_name\" content=\"Data Center Xpo\" \/>\n<meta property=\"article:published_time\" content=\"2025-09-25T11:19:48+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-09-25T11:20:19+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/exito-e.com\/datacenterxpo\/blog\/wp-content\/uploads\/2025\/09\/DCX-BLOG-BANNER.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1400\" \/>\n\t<meta property=\"og:image:height\" content=\"732\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"peakora\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"peakora\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/exito-e.com\\\/datacenterxpo\\\/blog\\\/design-and-construction-of-complex-technological-facilities\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/exito-e.com\\\/datacenterxpo\\\/blog\\\/design-and-construction-of-complex-technological-facilities\\\/\"},\"author\":{\"name\":\"peakora\",\"@id\":\"https:\\\/\\\/exito-e.com\\\/datacenterxpo\\\/blog\\\/#\\\/schema\\\/person\\\/c02ecde4b4431edd8c38307d96b249fb\"},\"headline\":\"Design And Construction of Complex Technological Facilities\",\"datePublished\":\"2025-09-25T11:19:48+00:00\",\"dateModified\":\"2025-09-25T11:20:19+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/exito-e.com\\\/datacenterxpo\\\/blog\\\/design-and-construction-of-complex-technological-facilities\\\/\"},\"wordCount\":330,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/exito-e.com\\\/datacenterxpo\\\/blog\\\/design-and-construction-of-complex-technological-facilities\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/exito-e.com\\\/datacenterxpo\\\/blog\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/DCX-BLOG-BANNER.jpg\",\"articleSection\":[\"Data center xpo\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/exito-e.com\\\/datacenterxpo\\\/blog\\\/design-and-construction-of-complex-technological-facilities\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/exito-e.com\\\/datacenterxpo\\\/blog\\\/design-and-construction-of-complex-technological-facilities\\\/\",\"url\":\"https:\\\/\\\/exito-e.com\\\/datacenterxpo\\\/blog\\\/design-and-construction-of-complex-technological-facilities\\\/\",\"name\":\"Design And Construction of Complex Technological Facilities\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/exito-e.com\\\/datacenterxpo\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/exito-e.com\\\/datacenterxpo\\\/blog\\\/design-and-construction-of-complex-technological-facilities\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/exito-e.com\\\/datacenterxpo\\\/blog\\\/design-and-construction-of-complex-technological-facilities\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/exito-e.com\\\/datacenterxpo\\\/blog\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/DCX-BLOG-BANNER.jpg\",\"datePublished\":\"2025-09-25T11:19:48+00:00\",\"dateModified\":\"2025-09-25T11:20:19+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/exito-e.com\\\/datacenterxpo\\\/blog\\\/#\\\/schema\\\/person\\\/c02ecde4b4431edd8c38307d96b249fb\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/exito-e.com\\\/datacenterxpo\\\/blog\\\/design-and-construction-of-complex-technological-facilities\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/exito-e.com\\\/datacenterxpo\\\/blog\\\/design-and-construction-of-complex-technological-facilities\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/exito-e.com\\\/datacenterxpo\\\/blog\\\/design-and-construction-of-complex-technological-facilities\\\/#primaryimage\",\"url\":\"https:\\\/\\\/exito-e.com\\\/datacenterxpo\\\/blog\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/DCX-BLOG-BANNER.jpg\",\"contentUrl\":\"https:\\\/\\\/exito-e.com\\\/datacenterxpo\\\/blog\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/DCX-BLOG-BANNER.jpg\",\"width\":1400,\"height\":732},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/exito-e.com\\\/datacenterxpo\\\/blog\\\/design-and-construction-of-complex-technological-facilities\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/exito-e.com\\\/datacenterxpo\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Design And Construction of Complex Technological Facilities\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/exito-e.com\\\/datacenterxpo\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/exito-e.com\\\/datacenterxpo\\\/blog\\\/\",\"name\":\"Data Center Xpo\",\"description\":\"Blog\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/exito-e.com\\\/datacenterxpo\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/exito-e.com\\\/datacenterxpo\\\/blog\\\/#\\\/schema\\\/person\\\/c02ecde4b4431edd8c38307d96b249fb\",\"name\":\"peakora\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/5633e03856d812007a03f225c948ee3174c854c109072c782283501ec95c5878?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/5633e03856d812007a03f225c948ee3174c854c109072c782283501ec95c5878?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/5633e03856d812007a03f225c948ee3174c854c109072c782283501ec95c5878?s=96&d=mm&r=g\",\"caption\":\"peakora\"},\"sameAs\":[\"https:\\\/\\\/weddingplanningconference.com\\\/blog\"],\"url\":\"https:\\\/\\\/exito-e.com\\\/datacenterxpo\\\/blog\\\/author\\\/landingpageblog\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Design And Construction of Complex Technological Facilities","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/exito-e.com\/datacenterxpo\/blog\/design-and-construction-of-complex-technological-facilities\/","og_locale":"en_US","og_type":"article","og_title":"Design And Construction of Complex Technological Facilities","og_description":"Data Center Project Every new data center project presents a unique challenge, requiring a blend of engineering precision and strategic foresight. One such project is Russia&#8217;s first certified Tier IV data center, entirely designed and built by our team on a turnkey basis. In this case, our company acted as the key partner, delivering a [&hellip;]","og_url":"https:\/\/exito-e.com\/datacenterxpo\/blog\/design-and-construction-of-complex-technological-facilities\/","og_site_name":"Data Center Xpo","article_published_time":"2025-09-25T11:19:48+00:00","article_modified_time":"2025-09-25T11:20:19+00:00","og_image":[{"width":1400,"height":732,"url":"https:\/\/exito-e.com\/datacenterxpo\/blog\/wp-content\/uploads\/2025\/09\/DCX-BLOG-BANNER.jpg","type":"image\/jpeg"}],"author":"peakora","twitter_card":"summary_large_image","twitter_misc":{"Written by":"peakora","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/exito-e.com\/datacenterxpo\/blog\/design-and-construction-of-complex-technological-facilities\/#article","isPartOf":{"@id":"https:\/\/exito-e.com\/datacenterxpo\/blog\/design-and-construction-of-complex-technological-facilities\/"},"author":{"name":"peakora","@id":"https:\/\/exito-e.com\/datacenterxpo\/blog\/#\/schema\/person\/c02ecde4b4431edd8c38307d96b249fb"},"headline":"Design And Construction of Complex Technological Facilities","datePublished":"2025-09-25T11:19:48+00:00","dateModified":"2025-09-25T11:20:19+00:00","mainEntityOfPage":{"@id":"https:\/\/exito-e.com\/datacenterxpo\/blog\/design-and-construction-of-complex-technological-facilities\/"},"wordCount":330,"commentCount":0,"image":{"@id":"https:\/\/exito-e.com\/datacenterxpo\/blog\/design-and-construction-of-complex-technological-facilities\/#primaryimage"},"thumbnailUrl":"https:\/\/exito-e.com\/datacenterxpo\/blog\/wp-content\/uploads\/2025\/09\/DCX-BLOG-BANNER.jpg","articleSection":["Data center xpo"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/exito-e.com\/datacenterxpo\/blog\/design-and-construction-of-complex-technological-facilities\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/exito-e.com\/datacenterxpo\/blog\/design-and-construction-of-complex-technological-facilities\/","url":"https:\/\/exito-e.com\/datacenterxpo\/blog\/design-and-construction-of-complex-technological-facilities\/","name":"Design And Construction of Complex Technological Facilities","isPartOf":{"@id":"https:\/\/exito-e.com\/datacenterxpo\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/exito-e.com\/datacenterxpo\/blog\/design-and-construction-of-complex-technological-facilities\/#primaryimage"},"image":{"@id":"https:\/\/exito-e.com\/datacenterxpo\/blog\/design-and-construction-of-complex-technological-facilities\/#primaryimage"},"thumbnailUrl":"https:\/\/exito-e.com\/datacenterxpo\/blog\/wp-content\/uploads\/2025\/09\/DCX-BLOG-BANNER.jpg","datePublished":"2025-09-25T11:19:48+00:00","dateModified":"2025-09-25T11:20:19+00:00","author":{"@id":"https:\/\/exito-e.com\/datacenterxpo\/blog\/#\/schema\/person\/c02ecde4b4431edd8c38307d96b249fb"},"breadcrumb":{"@id":"https:\/\/exito-e.com\/datacenterxpo\/blog\/design-and-construction-of-complex-technological-facilities\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/exito-e.com\/datacenterxpo\/blog\/design-and-construction-of-complex-technological-facilities\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/exito-e.com\/datacenterxpo\/blog\/design-and-construction-of-complex-technological-facilities\/#primaryimage","url":"https:\/\/exito-e.com\/datacenterxpo\/blog\/wp-content\/uploads\/2025\/09\/DCX-BLOG-BANNER.jpg","contentUrl":"https:\/\/exito-e.com\/datacenterxpo\/blog\/wp-content\/uploads\/2025\/09\/DCX-BLOG-BANNER.jpg","width":1400,"height":732},{"@type":"BreadcrumbList","@id":"https:\/\/exito-e.com\/datacenterxpo\/blog\/design-and-construction-of-complex-technological-facilities\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/exito-e.com\/datacenterxpo\/blog\/"},{"@type":"ListItem","position":2,"name":"Design And Construction of Complex Technological Facilities"}]},{"@type":"WebSite","@id":"https:\/\/exito-e.com\/datacenterxpo\/blog\/#website","url":"https:\/\/exito-e.com\/datacenterxpo\/blog\/","name":"Data Center Xpo","description":"Blog","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/exito-e.com\/datacenterxpo\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/exito-e.com\/datacenterxpo\/blog\/#\/schema\/person\/c02ecde4b4431edd8c38307d96b249fb","name":"peakora","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/5633e03856d812007a03f225c948ee3174c854c109072c782283501ec95c5878?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/5633e03856d812007a03f225c948ee3174c854c109072c782283501ec95c5878?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/5633e03856d812007a03f225c948ee3174c854c109072c782283501ec95c5878?s=96&d=mm&r=g","caption":"peakora"},"sameAs":["https:\/\/weddingplanningconference.com\/blog"],"url":"https:\/\/exito-e.com\/datacenterxpo\/blog\/author\/landingpageblog\/"}]}},"_links":{"self":[{"href":"https:\/\/exito-e.com\/datacenterxpo\/blog\/wp-json\/wp\/v2\/posts\/1387","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/exito-e.com\/datacenterxpo\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/exito-e.com\/datacenterxpo\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/exito-e.com\/datacenterxpo\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/exito-e.com\/datacenterxpo\/blog\/wp-json\/wp\/v2\/comments?post=1387"}],"version-history":[{"count":1,"href":"https:\/\/exito-e.com\/datacenterxpo\/blog\/wp-json\/wp\/v2\/posts\/1387\/revisions"}],"predecessor-version":[{"id":1390,"href":"https:\/\/exito-e.com\/datacenterxpo\/blog\/wp-json\/wp\/v2\/posts\/1387\/revisions\/1390"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/exito-e.com\/datacenterxpo\/blog\/wp-json\/wp\/v2\/media\/1389"}],"wp:attachment":[{"href":"https:\/\/exito-e.com\/datacenterxpo\/blog\/wp-json\/wp\/v2\/media?parent=1387"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/exito-e.com\/datacenterxpo\/blog\/wp-json\/wp\/v2\/categories?post=1387"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/exito-e.com\/datacenterxpo\/blog\/wp-json\/wp\/v2\/tags?post=1387"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}